Monday, August 23, 2010

Fuselage

Larry helped me with the tail.
Horizontal stabilizer fitted, rigged, drilled and bolted on. Elevators connected to pushrod.

Vertical stabilizer rigged drilled and bolted on.
[T8]

No comments: